RESOURCE

Mary Moss Playground

Park construction in the Witherspoon Jackson neighborhood
Phone Number
Email Address
No items found.

The Mary Moss Playground is located at the corner of John Street and Lytle Street in the Jackson-Witherspoon Historic District.  The following improvements are proposed:

·         Sprayground with 14 water spray features.

·         Playground equipment, including a birds nest swing, swings, spring toy, and composite play structure

·         Pavilion with picnic benches

·         Stone boulder scramble embankment with a pair of slides

·         Ornamental steel perimeter fencing

·         Concrete paver and sidewalk surfacing

·         Poured in place surfacing around the playground equipment

·         Reinforced concrete retaining walls and stairs to support a two-tiered site

·         Tree, shrub and groundcover plantings

·         Benches, bike racks, drinking fountain, book nook, and other site accessories

·         Relocation of the John Street crosswalk from the southern leg of the Lytle Street intersection to the northern leg

·         Traffic calming “speed cushions” on John Street

·         Sidewalk replacement along the project edges

This project has been awarded to V&K Construction, Inc. of Edison, NJ. Construction is expected to begin in late March 2018 and be complete in July 2018. 

Updates to the Mary Moss Park:

May 25, 2018

May 21, 2018
May 25, 2018
May 30, 2018

May 31, 2018
June 13, 2018
June 21, 2018
June 26, 2018
June 27, 2018
June 27, 2018
June 29, 2018
June 29, 2018
July 3, 2018
July 3, 2018

Additional Resources

No items found.

No items found.

Locations

No items found.

Members

No items found.
VIEW ALL MEMBERS