The following improvements, slated for construction in 2019, are proposed for Bank Street: 

·         Sanitary sewer main and lateral connections replacement

·        Water main and service connections replacement to be performed by New Jersey American Water

·         Storm sewer facilities drainage upgrades / extensions including new storm sewer inlets and piping to capture runoff from roof downspouts 

·         Granite curbing (on the north-south section) and concrete curbing (on the east-west section) installations

·         Concrete sidewalk replacement

·         Asphalt pavement roadway surface reconstruction

·        Pedestrian streetscape improvements at Nassau Street connection

This project is currently in the design phase. This project is funded by the NJ Department of Transportation, NJ Environmental Infrastructure Fund, and Princeton capital accounts.